Mercedes C-Class

W203 since 2000 of release

Repair and car operation



Mercedes-Benz
+ Mercedes-Benz Cars of a class C (W-203)
+ Operation manual
+ Routine maintenance
+ Engine
+ cooling and heating Systems
+ Power supply system and release
+ engine Electric equipment
+ Manual transmission
- Automatic transmission
   Specifications
   + the Automated box of gear shifting 716.6
   - Automatic transmission 722.6
      Search of malfunctions - the general information
      Problems of the block of electronic control and operating signals
      Removal and AT installation with the hydrotransformer
      The AT electrohydraulic control unit (AT is established)
      Dismantling and assembly of the electrohydraulic control unit
      Dismantling and assembly of a plate of gear shifting
      Case of transmission and hydrotransformer
      Multidisk brakes В2, В3 and a blocking gear wheel at "Parking"
      Dismantling and assembly of a back hollow shaft with the back coupling of a free wheeling
      Removal and installation of multidisk brake В1 and oil pump
      Dismantling and assembly of the oil pump
      Dismantling and assembly of multidisk brake В1
      Dismantling and assembly of multidisk brake В2
      Dismantling and assembly of a target shaft with the central and back block of planetary gear wheels
      Removal and installation of multidisk couplings К1, К2 and К3
      Dismantling and assembly of coupling К1
      Dismantling and assembly of a leading shaft with coupling К2 and the forward block of planetary gear wheels
      Dismantling and assembly of coupling К3
      The blocking mechanism at "parking"
      Removal and installation of the lever of the selector of gear shifting
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment






Removal and installation of the lever of the selector of gear shifting

Removal and installation of the lever of the selector of gear shifting (with the regime W/S switch)

39 — Laying
40 — Bolts (4 pieces)
97 — the Intermediate lever
S16/10 — the Switch of identification of the included transfer
S16/10s2 — the Switch of lamps of a backing
Y66/1 — the Electromagnetic drive of blocking of the provisions "R/P"

Drive of management of AT

1 — the Cable of the central block of gear shifting
2 — the Handle of the lever of gear shifting
3 — the Control unit the indicator of transfers
4 — the Central block of gear shifting
5 — the Tip of draft of switching
6 — Draught of gear shifting
7 — the Finger for draft connection

Removal

 PERFORMANCE ORDER

1. Remove the switching lever from the intermediate lever (97).
2. Remove the central console.
3. Unscrew bolts (40).
4. Disconnect sockets and an electromagnetic drive of blocking of the provisions "R/P" (Y66/1) from the identification switch (S16/10), the switch of lamps of a backing (S16/10S2).
5. Remove the lever of the selector of gear shifting assembled from a floor.


Installation

 PERFORMANCE ORDER

Installation is carried out as it should be, the return to removal. Check on correctness of installation laying (39) and its condition if it is necessary, replace it.