Mercedes C-Class

W203 since 2000 of release

Repair and car operation



Mercedes-Benz
+ Mercedes-Benz Cars of a class C (W-203)
+ Operation manual
+ Routine maintenance
+ Engine
+ cooling and heating Systems
+ Power supply system and release
+ engine Electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
- Body
   + Leaving and external equipment of a body
   - Salon equipment
      Remarks on work with the salon and security measure equipment
      Removal and installation of a razzhimny clip
      Removal and cover installation under the dashboard
      Removal and installation of the lower part of the dashboard
      Removal and installation of a ware box
      Removal and cover installation under a ware box
      Removal and installation of the central console
      Removal and installation of a cover of the top part of the central console
      Removal and installation of an internal mirror
      Removal and facing installation in a cargo compartment
      Removal and installation of a forward seat
      Removal and installation of a back seat
      Removal and shelf installation
      Removal and installation of facing of racks And and In
      Removal and installation of facing are resistant C
+ Onboard electric equipment






Removal and shelf installation

Sedan

Removal

 PERFORMANCE ORDER

1. Release a back of a seat and cast away it forward.

2. Open a luggage carrier and disconnect a cable (1) from the lock of a back of a back seat.

3. Remove facing of a rack by C, address to appropriate section.
4. Remove a lateral pillow of a back of a back seat as it is described in Section 57.

5. Take out by means of a plastic wedge on the right and at the left the top fastenings (1) lateral pillow. (6) – lock of a back of a back seat.

6. Take out the right and left clips (2).
7. Take out by means of a plastic wedge the right and left lock buttons (3).
8. Take out from the car the shelf (4).
9. Take out by means of a plastic wedge from the shelf of 2 covers (5).


Installation

 PERFORMANCE ORDER

Installation is carried out in sequence, return to removal.